![]() |
||||||||||||||||||||||||||||||||||||
![]() |
||||||||||||||||||||||||||||||||||||
Air Heat![]()
|
RAH, TAH-R (Jul. 04) AH-O, TAH-O (Nov. 03) |
RAH, TAH-R (Nov. 03) AH-O, TAH-0 (Nov. 03) |
V1 DAH 140-2 (Nov. 93) V1 TAH 140-3 (May 04) V1 CAH 140-4 (Nov. 93) V1 RAH 142-1(Feb. 05) V1 TAH-R 142-2 (Jan. 10) V1 AH-O 144-1 (Oct. 11) V1 TAH-O 144-2 (Nov. 93) |
Gas Heated Dryer Start-Up Sequence |
Side Plate Assemblies include a burner, integral pilot, ignition plug, flame rod, low fire air bypass with check valve, adjustable pilot cock, and combustion air blower. Standard Sideplates are designed to fire horizontally with air flow from left to right when facing the gas piping. If necessary, other arrangements can be supplied. |
If you don't see the technical document that you need listed, contact techdocs@peconet.com and we will try to locate it in our archives.
![]() |
Back to Previous Page |
[Brochures] [Products] [Hot Stuff] [Services] [Contact] [Related Links] [Tech Bulletins]
©2011 Power Equipment Company
2011 Williamsburg Road Richmond, VA 23231
804-236-3800 Fax 804-236-3882
sales@peconet.com
SITE MAP
Terms & Conditions